Oil & Gas Projects
Upstream:
- End Customer: Aconcagua Energy.
Entre Lomas Plant, PTG. System Verification Vent, discharge new PSV PSE-403.
- End Customer: TECPETROL.
Los Bastos Plant. Revamp PTG, PTC, Calculation Memories.
Midstream:
- End Customer: PAN AMERICAN ENERGY, Argentina.
Lindero Atravesado Pipeline— Centenario (19.5 Km, 10”, Neuquén). Detail Engineering (Processes).
- End Customer: ENARSA, Argentina.
“GPNK” President Nestor Kirchner Gas Pipeline, Mercedes - Cardales Section (80 Km, 30”). Fiscal Conditioning and Measurement Units. Detail Engineering (Processes).
Downstream:
- End Customer: PAN AMERICAN ENERGY, Campana Refinery.
H2 Compressors, NHT Unit. New Compressors
NH-C-002 A/B, Kod, Heat Exchanger. Extended Basic Engineering.
- ING. OF PROCESSES
- ING. ELECTRICAL
- ING. INSTRUMENTATION
- COMPUTATION OF QUANTITIES AND TASKS FOR CAPEX BUDGET
Mining Projects (Lithium):
Customer: Minera Exar.
- Carbonation Plant. Electrical Engineering New Agitator PCLA-1059-AGT-1192A.
- Carbonation Plant. Warehouse maintenance property. Electrical Doc. for Installation of New Reagents Warehouse Office.
- BY-PASS Reactors REA 1547/37. Process and Instrumentation Engineering. New Flow Control Loops.
- Carbonation Plant. Electrical Engineering. Maintenance Warehouse Property.
- SE-1301, CCM-1306. Electrical Engineering. New Board column 5, cubicle 8 for Heater and Brushes.
- Riles Plant. Process Engineering. Water Hammer Study. Control Logic Design.
- Carbonation Plant. Syst. BB Mother Liqueur. Process Engineering. Definition of Pump and control valve.
- SX Plant. PTA BORO. New TK of TRASCLOR HCL 32%. Process and Instrumentation Engineering.
- Reverse Osmosis Plant. Process Engineering. Capacity verification of 1 train for new production capacity.
- SX Plant. BORON plant. Process and Instrumentation Engineering. Replacement with TK's GRP.
- Riles Plant. Process Engineering. Riles Modification.
- BY-PASS Reactors REA 1547/37. Process Engineering.
- Carbonation Plant. Mother Liquor BB System. Process Engineering. Mass Balance and Hydraulic Calculation.
- Mother Liqueur. Entry into Peeler Centrifuges. Process Engineering. New mass flowmeters and regulation valves.
- Carbonation Plant. South Courtyard. New Pump missing PCLA-1035-BBS-1588. CCM1305. Electrical Engineering.
- SX Plant. Interconnection of 2nd Purification and SX Output. Process and Instrumentation Engineering. New flowmeters and control valves.
- SE 1401. COR Tape VDF Replacement - Purification. Electrical Engineering. Modifications in CCM-1403.
- Reagent Plant - AyD SODA ASH. New BBA 1040/41. Process and Instrumentation Engineering. New flowmeters and control valves.
- BY-PASS Reactors REA 1547/37. Process and Instrumentation Engineering. New control logic in valves and equipment.
- Reverse Osmosis Plant. Process and Instrumentation Engineering. Adaptation of TAGs of BHY Equipment and Instruments to the standard Exar format.
- ASH Soda Plant. SE 1301. New VFD assembly in Room 1301, CCM 1305 and 1306. Electrical Engineering.
- SX Plant. Electrical Engineering. New column in CCM-1201 for new BBA-1128 and 9 pumps.
- SX Plant. Process Engineering. Hydraulic calculation from EST-1125 tank and BB-1128/29 (NaOH) pumps to consumers.
- Lime Plant. New Reactor Transfer and Recirculation Pump. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical.
- Lime Plant. SSL Plant. New Flocculant Plant. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical.
- SSL plant. New CIP Washing Unit. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical.