Oil & Gas Projects

Upstream:

  • End Customer: Aconcagua Energy. 

Entre Lomas Plant, PTG. System Verification Vent, discharge new PSV PSE-403. 

  • End Customer: TECPETROL. 

Los Bastos Plant. Revamp PTG, PTC, Calculation Memories. 

 

Midstream:

  • End Customer: PAN AMERICAN ENERGY, Argentina. 

Lindero Atravesado Pipeline— Centenario (19.5 Km, 10”, Neuquén).  Detail Engineering (Processes). 

  • End Customer: ENARSA, Argentina. 

“GPNK” President Nestor Kirchner Gas Pipeline, Mercedes - Cardales Section (80 Km, 30”). Fiscal Conditioning and Measurement Units. Detail Engineering (Processes).

 

Downstream:

  • End Customer: PAN AMERICAN ENERGY, Campana Refinery. 

H2 Compressors, NHT Unit. New Compressors 

NH-C-002 A/B, Kod, Heat Exchanger. Extended Basic Engineering.

  • ING. OF PROCESSES 
  • ING. ELECTRICAL 
  • ING. INSTRUMENTATION 
  • COMPUTATION OF QUANTITIES AND TASKS FOR CAPEX BUDGET


Mining Projects (Lithium):

Customer: Minera Exar.  

  • Carbonation Plant. Electrical Engineering New Agitator PCLA-1059-AGT-1192A.
  • Carbonation Plant. Warehouse maintenance property. Electrical Doc. for Installation of New Reagents Warehouse Office.
  • BY-PASS Reactors REA 1547/37. Process and Instrumentation Engineering. New Flow Control Loops. 
  • Carbonation Plant. Electrical Engineering. Maintenance Warehouse Property. 
  • SE-1301, CCM-1306.  Electrical Engineering. New Board column 5, cubicle 8 for Heater and Brushes.
  • Riles Plant. Process Engineering. Water Hammer Study. Control Logic Design.
  • Carbonation Plant. Syst. BB Mother Liqueur. Process Engineering. Definition of Pump and control valve. 
  • SX Plant. PTA BORO. New TK of TRASCLOR HCL 32%. Process and Instrumentation Engineering.
  • Reverse Osmosis Plant. Process Engineering. Capacity verification of 1 train for new production capacity.
  • SX Plant. BORON plant. Process and Instrumentation Engineering. Replacement with TK's GRP. 
  • Riles Plant. Process Engineering. Riles Modification.
  • BY-PASS Reactors REA 1547/37. Process Engineering.
  • Carbonation Plant. Mother Liquor BB System. Process Engineering. Mass Balance and Hydraulic Calculation.
  • Mother Liqueur. Entry into Peeler Centrifuges. Process Engineering. New mass flowmeters and regulation valves.
  • Carbonation Plant. South Courtyard. New Pump missing PCLA-1035-BBS-1588. CCM1305. Electrical Engineering. 
  • SX Plant. Interconnection of 2nd Purification and SX Output. Process and Instrumentation Engineering. New flowmeters and control valves. 
  • SE 1401. COR Tape VDF Replacement - Purification. Electrical Engineering. Modifications in CCM-1403.
  • Reagent Plant - AyD SODA ASH. New BBA 1040/41. Process and Instrumentation Engineering. New flowmeters and control valves.
  • BY-PASS Reactors REA 1547/37. Process and Instrumentation Engineering. New control logic in valves and equipment.
  • Reverse Osmosis Plant. Process and Instrumentation Engineering. Adaptation of TAGs of BHY Equipment and Instruments to the standard Exar format.
  • ASH Soda Plant. SE 1301. New VFD assembly in Room 1301, CCM 1305 and 1306. Electrical Engineering.
  • SX Plant. Electrical Engineering. New column in CCM-1201 for new BBA-1128 and 9 pumps.
  • SX Plant. Process Engineering. Hydraulic calculation from EST-1125 tank and BB-1128/29 (NaOH) pumps to consumers.
  • Lime Plant. New Reactor Transfer and Recirculation Pump. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical. 
  • Lime Plant. SSL Plant. New Flocculant Plant. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical. 
  • SSL plant. New CIP Washing Unit. Process Engineering, Civil, Structural, Mechanical, Instrumentation and Electrical.