REFERENCE PROJECTS SCOPE OF WORK

RELIEF SYSTEM VERIFICATION

PTG, GAS TREATMENT PLANT, CHARCO BAYO FIELD, ENTRE LOMAS AREA

END CUSTOMER: ACONCAGUA ENERGY, ARGENTINA

PROCESS ENGINEERING, FEED

  • CALCULATION OF NEW PSV PSE-403  
  • CALCULATION REPORT, VERIFICATION OF RELIEF SYSTEM.

EXPANSION OF CRUDE OIL AND GAS TREATMENT PLANT

PTC - PTG LOS BASTOS “LBAS”

END CUSTOMER: TECPETROL

PROCESS ENGINEERING, FEED

  • CALC. REPORT—SALINITY ANALYSIS
  • CALC. REPORT—WATER STORAGE TANK
  • CALC. REPORT—MULTIPHASE HEATER
  • CALC. REPORT—DISPATCH PUMPS
  • CALC. REPORT—PTG RELIEF SYSTEM
  • CALC. REPORT—FUEL GAS SYSTEM
  • PTC OPERATION MANUAL
  • PTG OPERATION MANUAL



H2 COMPRESSORS, NHT UNIT.

(60+ DOC.)

NEW COMPRESSORS NH-C-002 A/B, KOD, HEAT  EXCHANGER

END CUSTOMER: AXION ENERGY, CAMPANA REFINERY, ARGENTINA

FEED

  • PROCESS
  • ELECTRICAL
  • INSTRUMENTATION
  • BILL OF MATERIAL FOR CAPEX ESTIMATION

INSTRUMENTATION:

DESCRIPTIVE MEMORY OF THE INSTRUMENTATION AND CONTROL INSTALLATION

LIST OF INSTRUMENTS

LIST OF SIGNS

CONTROL AND SELF-REGULATING VALVES DATA SHEET

ON-OFF VALVES DATA SHEET

SAFETY VALVES DATA SHEET

FLOWMETER DATA SHEET

PRIMARY FLOW ELEMENTS DATA SHEET

TEMPERATURE INSTRUMENTS DATA SHEET

LEVEL INSTRUMENTS DATA SHEET

PRESSURE INSTRUMENTS DATA SHEET

F&G DATA SHEET

COUNT OF CABLES AND ELECTRICAL INSTALLATION MATERIALS

LOCATION PLANE AND INSTRUMENT CABLE CHANNELS

LAY OUT OF INSTRUMENT IMPLEMENTATION, PASSAGE BOXES/FIELD PANELS/F&G

 INSTRUMENT CABLE LIST

REQUIREMENT FOR CONTROL AND SELF-REGULATING VALVES

ON-OFF VALVES REQUIREMENT

SAFETY VALVES REQUIREMENT

FLOWMETER REQUIREMENTS

REQUISITION OF PRIMARY FLOW ELEMENTS

REQUIREMENT OF TEMPERATURE INSTRUMENTS

REQUISITION OF LEVEL INSTRUMENTS

REQUISITION OF PRESSURE INSTRUMENTS

REQUISITION OF F&G INSTRUMENTS

REQUISITION/TRANSMITTERS OF OTHER INSTRUMENTS

INSTRUMENT CABLES REQUIREMENT

ELECTRICAL MATERIALS REQUIREMENT

REQUISITION OF MECHANICAL MATERIALS

COMPUTATION OF MECHANICAL INSTALLATION MATERIALS, INCLUDING SUPPORTS

COMPUTATION OF QUANTITIES AND TASKS FOR CAPEX BUDGET

 

PROCESS:

CALCULATION MEMORY - HOLE PLATES AND RESTRICTION HOLES

CALCULATION MEMORY - CONTROL VALVES

CALCULATION MEMORY - PRESSURE RELIEF DEVICES

ELECTRICAL:

MOTOR STARTING STUDY

DESCRIPTIVE MEMORY OF THE ELECTRICAL INSTALLATION

LOW VOLTAGE SINGLE-FILE DIAGRAMS

MEDIUM VOLTAGE SINGLE LINE DIAGRAMS

ELECTRICAL EQUIPMENT DATA SHEETS

REQUISITION OF ELECTRICAL EQUIPMENT

LOAD LIST

LOAD BALANCE

SE/ELECTRICAL ROOM LAYOUT (DASHBOARD SURVEY)

MC CABLES

CABLE LIST

ELECTRICAL CHANNELS DRAWING

LIST OF ELECTRICAL MATERIALS

MATERIAL REQUIREMENTS - ELECTRICAL MATERIALS

SE VERIFICATION TECHNICAL REPORT

LOAD FLOW STUDY AND ICC 

TECHNICAL SPECIFICATION OF AUTOMATIC SWITCH

SOFT STARTER TECHNICAL SPECIFICATION

CIRCUIT SWITCH REQUIREMENT

CLASSIFICATION OF HAZARDOUS AREAS KNHF PLANT – LAYOUT

CLASSIFICATION OF HAZARDOUS AREAS KNHF PLANT – ELEVATION

COMPUTATION OF QUANTITIES AND TASKS FOR CAPEX BUDGET

CRUDE OIL PIPELINE. 

LINDERO ATRAVESADO—CENTENARIO:

END CUSTOMER: PAN AMERICAN ENERGY, ARGENTINA

  • DETAIL ENGINEERING◦ C/E MATRIX
  • P&ID CRUDE OIL INDIRECT HEATER
  • LACT UNIT PID
  • CONTROL LOGIC & INTERLOCKS
  • OPERATING MANUAL
  • OPERATING AND CONTROL PHILOSOPHY

 

GAS PIPELINE  “GPNK”. 

CUSTODY MEASUREMENT AND CONDITIONING UNITS:

END CUSTOMER: ENARSA , ARGENTINA.

  • DETAIL ENGINEERING
  • MERCEDES-CARDALES DUCT
  • CUSTODY FLOW RATE MEASUREMENT, FILTERS, SEPARATORS, SCRAPPERS TRAPS, REGULATION SKIDS
  • PROCESS SIMULATION
  • P&IDS UPDATE
  • CONTROL VALVES AND RO CALCULATION
  • PROCESS DELIVERABLES
  • DATASHEETS

NEW HEATING PUMP. 

PHOSPHATE AND DEGREASING  SYSTEM

END CUSTOMER: TOYOTA, ARGENTINA

  • FEED
  • PROCESS SIMULATION
  • P&ID
  • MASS & ENERGY BALANCE
  • HYDRAULIC CALCULATION
  • DEFINITION OF MODEL OF PUMP AND HEATER
  • DESCRIPTIVE REPORT

 

LITHIUM CARBONATE PLANT

LIME PLANT

CUSTOMER: EXAR MINERA, ARGENTINA

EXTENDED BASIC ENGINEERING

NEW TRANSFER PUMP

  • INSTRUMENTATION
  • CIVIL (CONCRETE)
  • METAL STRUCTURES (SKID)

 

LITHIUM CARBONATE PLANT

LIME PLANT

CUSTOMER: EXAR MINERA, ARGENTINA
EXTENDED BASIC ENGINEERING
REPLACEMENT OF FLOCULANT PUMPS

  • PROCESS ENGINEER
  • MECHANICS
  • ELECTRICITY
  • INSTRUMENTATION
  • METAL STRUCTURE (SKID)

 

LITHIUM CARBONATE PLANT

LIME PLANT

CUSTOMER: EXAR MINERA, ARGENTINA

EXTENDED BASIC ENGINEERING

NEW CIP WASHING UNIT

  • PROCESS ENGINEER
  • MECHANICS
  • ELECTRICITY
  • INSTRUMENTATION
  • CIVIL (CONCRETE FOUNDATION)
  • METAL STRUCTURE (SKID)

 

LITHIUM CARBONATE PLANT

SX PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

HYDRAULIC VERIFICATION FROM EST-1125 AND BBA-1128/9 TO CONSUMERS 

  • HYDRAULIC SIMULATION OF THE PROCESS
  • VERIFICATION OF SPEED AND LOAD LOSS IN PIPELINES
  • CHECKING SELECTED PUMPS (HEIGHT, FLOW, ANPA, POWER)

 

LITHIUM CARBONATE PLANT

ASH SODA PLAN

CUSTOMER: EXAR MINING, ARGENTINA

BASIC ELECTRICAL ENGINEERING

DOC UPDATE CCM 1305/ 1306 TO INSTALL NEW VFD FOR BBA-1025/6 PUMPS

  • SINGLE-LINE DIAGRAM
  • POWER DIAGRAM
  • TOPOGRAPHIC PLAN
  • FUNCTIONAL DIAGRAM
  • TERMINAL BLOCK DIAGRAM
  • LIST OF MATERIALS

 

 

LITHIUM CARBONATE PLANT

SX PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC ELECTRICAL ENGINEERING

DOC UPDATE CCM 1201/ 1202 TO INSTALL NEW COLUMN FOR BBA-1128/9 PUMPS.

  • SINGLE-LINE DIAGRAM
  • POWER DIAGRAM
  • TOPOGRAPHICAL PLAN
  • FUNCTIONAL DIAGRAM
  • TERMINAL BLOCK DIAGRAM
  • LIST OF MATERIALS

 

 

LITHIUM CARBONATE PLANT

REVERSE OSMOSIS PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

TAGGING OF EQUIPMENT AND INSTRUMENTS WITH EXAR NUMBERING

  • LIST OF EQUIPMENT WITH EXAR TAG
  • LIST OF INSTRUMENTS WITH TAG EXAR
  • TAG UPDATE IN P&ID

 

PHOSPHATE AND DEGREASER SYSTEM

REVERSE OSMOSIS PLANT 

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

VERIFICATION OF CAPACITY OF EQUIPMENT BEFORE INCREASE IN PRODUCTION

  • OSMOSIS MEMBRANES
  • HIGH AND LOW PRESSURE PUMPS
  • BAG AND CARTRIDGE FILTER
  • PIPES
  • NEW EQUIPMENT DATA SHEET
  • RECOMMENDATION REPORT

 

LITHIUM CARBONATE PLANT

CARBONATION REACTORS

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

PROPOSAL WITH NEW CONTROL SCHEME WITH RECYCLING

  • SIMULATION OF THE PROCESS
  • CONTROL PHILOSOPHY
  • P&ID DIAGRAM

 

LITHIUM CARBONATE PLANT

ASH SODA PLAN

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

NEW PUMP BBA-1040/41 NEW CONTROL VALVE FV-9230A AND FLOWMETER FIT-6230

  • HYDRAULIC CALCULATION
  • CONTROL VALVE CALCULATION
  • FLOWMETER DATA SHEET
  • DATA SHEET V. CONTROL

 

LITHIUM CARBONATE PLANT

SX PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC ELECTRICAL ENGINEERING

ADJUSTMENT OF ELECTRICAL PROTECTION. DOC UPDATE CCM 1403 (SCHNEIDER) ON S.E.1401 TO INSTALL NEW COR PURIFICATION TAPE VFD.

  • SINGLE-LINE DIAGRAM
  • POWER DIAGRAM
  • TOPOGRAPHIC PLAN
  • FUNCTIONAL DIAGRAM
  • TERMINAL BLOCK DIAGRAM
  • LIST OF MATERIALS

 

 

LITHIUM CARBONATE PLANT

SX PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

DETERMINATION OF FLOWMETERS AND REGULATION VALVES IN THE 2ND PURIFICATION AND SX OUTPUT INTERCONNECTION.

  • CONTROL PHILOSOPHY
  • P&ID DIAGRAM
  • FLOWMETER DATA SHEET
  • REGULATING VALVES DATA SHEET
  • LIST OF INSTRUMENTS, SIGNALS AND CABLES

 

 

LITHIUM CARBONATE PLANT

ASH SODA PLAN

CUSTOMER: EXAR MINING, ARGENTINA

BASIC ELECTRICAL ENGINEERING

PUMP PCLA-1035-BBS-1588. CCM-1305 UPGRADE (SCHNEIDER ELECTRIC)

  • DOCUMENT DIGITIZATION FROM CCM (SCHNEIDER)
  • ELECTRICAL CONDUITS
  • LIST OF MATERIALS FOR ASSEMBLY AND PIPING

 

LITHIUM CARBONATE PLANT

ASH SODA PLAN

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

DETERMINE FLOWMETER AND REGULATION VALVE IN THE PEELER CENTRIFUGE INLET.

  • DATA SHEET V. CONTROL
  • MASS FLOWMETER DATA SHEET

 

LITHIUM CARBONATE PLANT

CARBONATION PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

SYST. BB MOTHER LIQUOR. OVERFLOW IN CENTRIFUGAL DISCHARGE.

  • MASS BALANCE AND SIMULATION
  • HYDRAULIC VERIFICATION OF PIPES
  • P&ID DIAGRAM
  • PUMP VERIFICATION
  • BBAS AND V DATA SHEET. LOCK
  • RECOMMENDATIONS REPORT

 

LITHIUM CARBONATE PLANT

CARBONATION PLANT

CUSTOMER: EXAR MINING, ARGENTINA

BASIC PROCESS ENGINEERING

RILES MODIFICATION. FAILURE IN CHECK VALVES. HYDRAULIC STUDY (WATER BLOW)

  • MASS BALANCE
  • HYDRAULIC VERIFICATION OF PIPES AND WATER HAMMER
  • RECOMMENDATIONS REPORT
  • PHILOSOPHY NEW CONTROL LEVEL REPLACEMENT VFD WITH CONTROL V.
  • CHANGED PID
  • DATA SHEET V. CONTROL

 

LITHIUM CARBONATE PLANT

PLANTA DE BORO

CUSTOMER: EXAR MINING, ARGENTINA

BASIC ENGINEERING PROCESSES & INSTRUM.

REPLACEMENT TKS HCL 32% BY GRP.

  • CALCULATION AND HD V. OF PRESSURE/VACUUM
  • TK INSTRUMENTS DATA SHEET
  • INSTRUMENT CHANNELING
  • LOOP DIAGRAM
  • LIST OF MATERIALS

 

 

H2 COMPRESSORS, NHT UNIT

NEW COMPRESSORS NH-C-002 A/B, KOD, HEAT EXCHANGER

END CUSTOMER PAN AMERICAN ENERGY, CAMPANA REFINERY

ING. EXTENDED BASIC

  • ING. OF PROCESSES
  • ELECTRICAL ING.
  • INSTRUMENTATION ENGINEER
  • COMPUTATION OF QUANTITIES AND TASKS FOR CAPEX BUDGET